Matched to your stack in about a week. Vetted for the work, never swapped for someone cheaper. How we vet →

What we do·Engineering & Cloud·Migration

Cloud Migration.

Move the platform. Keep the uptime. Cut the bill.

Migrations fail on the last 10%: the cron job nobody owns, the IP allowlist nobody documented. We migrate with dual-run rigor. The new environment earns traffic gradually, and the old one dies only when the graphs say so.

0
Customer-visible incidents in our last 4 cutovers
25–40%
Typical cost reduction

How we approach it

Inventory and dependency mapping, landing-zone design, IaC from day one, dual-write / shadow-traffic cutovers, DNS choreography, and a FinOps pass so the new bill is smaller than the old one.

Inventory and dependency mapping, landing-zone design, IaC from day one, dual-write / shadow-traffic cutovers, DNS choreography, and a FinOps pass so the new bill is smaller than the old one.

  • Zero-downtime cutovers, rehearsed before performed
  • Infrastructure as code. No hand-built snowflakes survive
  • Compliance-ready landing zones (HIPAA, SOC 2)
  • Post-migration FinOps: typical bills drop 25–40%

Proof

We've shipped this before.

FAQ

Before you ask.

On-prem to cloud, or cloud to cloud?
Both, plus the increasingly common cloud-to-cheaper-cloud. The method is the same: inventory, shadow, cutover, decommission.
How long does a migration take?
A honest range: 6 weeks for a contained platform, two quarters for an estate. The inventory week produces the real number.

How we approach it

Inventory and dependency mapping, landing-zone design, IaC from day one, dual-write / shadow-traffic cutovers, DNS choreography, and a FinOps pass so the new bill is smaller than the old one.

Customer-visible incidents in our last 4 cutovers
0
Typical cost reduction
25–40%

Proof

We've shipped this before.

FAQ

Before you ask.

On-prem to cloud, or cloud to cloud?
Both, plus the increasingly common cloud-to-cheaper-cloud. The method is the same: inventory, shadow, cutover, decommission.
How long does a migration take?
A honest range: 6 weeks for a contained platform, two quarters for an estate. The inventory week produces the real number.

Tell us the hard part.

A 30-minute call with an engineer, not a salesperson. Honest scoping, real dates.

Work with LateralEngineers · Teams · Entire builds
Let’s talk